tatsblisters 9,913 Posted January 9, 2024 Report Share Posted January 9, 2024 On 08/01/2024 at 22:22, mC HULL said: everything end ups wet threw in them from condensation unless insulated and then still not ideal Expand Same with them steel sheds you can get unless you store tools in them plastic storage boxes. 1 Quote Link to post Share on other sites
downsouth 7,340 Posted January 9, 2024 Report Share Posted January 9, 2024 On 08/01/2024 at 22:35, DIDO.1 said: Good call that....roof and floor rusting but a new roof and marine ply floor would do it eh Expand Yeah mate.Wr normally run a 5x2 the full length down one side and a 2x2 down the other.Pull a line between them and space a 4x2 and a 3x2 acordingly.Fix them with tech screws from the inside.Then just fix whatever roof sheets yo have to the timbers leaving a nice 150mm overhang both sides 3 Quote Link to post Share on other sites
downsouth 7,340 Posted January 9, 2024 Report Share Posted January 9, 2024 Fella Im working for atm has branched out into doing these ground screws atm.I was a bit sceptical at first but the more Ive seen them used and been doing them with him the more Ive seen the advantages.This job we also built the frame and plyed it for a big garden building to go on but weve done them for big decking areas and done a lot for people to sit containers on.They save loads of muckaway and are great if you have shit acces for getting concrete etc in.Just carry however many screws in that are needed and the drill.All your marking out gear and levels and away you go. 1 Quote Link to post Share on other sites
Daniel cain 45,591 Posted January 9, 2024 Report Share Posted January 9, 2024 On 08/01/2024 at 22:35, DIDO.1 said: Good call that....roof and floor rusting but a new roof and marine ply floor would do it eh Expand Sit the floor on breeze block pads ,stop it rotting out again so quick,and box profile sheets over the roof...get some guttering on it,and use storage containers to collect the run off ... 1 Quote Link to post Share on other sites
DIDO.1 22,844 Posted January 9, 2024 Author Report Share Posted January 9, 2024 On 09/01/2024 at 10:20, Daniel cain said: Sit the floor on breeze block pads ,stop it rotting out again so quick,and box profile sheets over the roof...get some guttering on it,and use storage containers to collect the run off ... Expand All time and money though isn't it Quote Link to post Share on other sites
NEWKID 27,182 Posted January 9, 2024 Report Share Posted January 9, 2024 I reckon you'd get a few quod for them even with a couple of holes in the roof mate, if your not up for doing them up someone else will be...probably get more than you will for scrap if you advertise them Quote Link to post Share on other sites
DIDO.1 22,844 Posted January 9, 2024 Author Report Share Posted January 9, 2024 On 09/01/2024 at 17:22, NEWKID said: I reckon you'd get a few quod for them even with a couple of holes in the roof mate, if your not up for doing them up someone else will be...probably get more than you will for scrap if you advertise them Expand Could possibly sell one and use the money to do the other up. We have 2 massive pens and 7 sheds all needing doing up this next season as well. Time and money. Both run out sharpish 1 Quote Link to post Share on other sites
mel b 2,478 Posted January 9, 2024 Report Share Posted January 9, 2024 On 09/01/2024 at 17:35, DIDO.1 said: Could possibly sell one and use the money to do the other up. We have 2 massive pens and 7 sheds all needing doing up this next season as well. Time and money. Both run out sharpish Expand Corrugated metal sheets aren't too expensive. I did my caravan roof with green ones. Iirc I paid £20 each , for 10' x 3'7" sheets . The box profile sheets were much cheaper. 1 Quote Link to post Share on other sites
mackem 26,774 Posted January 9, 2024 Report Share Posted January 9, 2024 On 09/01/2024 at 16:46, DIDO.1 said: All time and money though isn't it Expand Everything in life worth having takes time (effort) or money or both old chap. 2 Quote Link to post Share on other sites
mC HULL 12,799 Posted January 9, 2024 Report Share Posted January 9, 2024 On 09/01/2024 at 18:30, mel b said: Corrugated metal sheets aren't too expensive. I did my caravan roof with green ones. Iirc I paid £20 each , for 10' x 3'7" sheets . The box profile sheets were much cheaper. Expand more 40 quid here i did me she’d out them in grey 3.6x2.5 meter a lot cheaper then the plastic cladding lol Quote Link to post Share on other sites
mel b 2,478 Posted January 9, 2024 Report Share Posted January 9, 2024 On 09/01/2024 at 19:06, mC HULL said: more 40 quid here i did me she’d out them in grey 3.6x2.5 meter a lot cheaper then the plastic cladding lol Expand We stumbled across a really cheap company on ebay , that were only a mile from my house . They're a bit of a pain to deal with , but worth the effort for the cost saving. I did the roof on my wife's workshop , and when we went there to collect the sheets, he'd got some 10' x 3'7' sheets left over from a job , and I'm sure that I only paid about £15.00 each for them . He even threw in a couple for free. He also had ,grey , box profile sheets , that were left over , and I think that they were about a tenner. 1 Quote Link to post Share on other sites
mel b 2,478 Posted January 9, 2024 Report Share Posted January 9, 2024 On 09/01/2024 at 19:06, mC HULL said: more 40 quid here i did me she’d out them in grey 3.6x2.5 meter a lot cheaper then the plastic cladding lol Expand These are the ones I used on my Mrs workshop. A very easy , quick , and relatively cheap fix . 1 Quote Link to post Share on other sites
Daniel cain 45,591 Posted January 9, 2024 Report Share Posted January 9, 2024 On 09/01/2024 at 16:46, DIDO.1 said: All time and money though isn't it Expand Half a day each container,if your on your own I'd say...cut out the old rotten floor..60/70mm of concrete,and set your first breeze block in the corner nice and level,strung a line up,then repeat every 800/900...cut timber bearers, noggins every 600,then board with marine ply and some sort of preservative diesel/oil mix creosote etc Quote Link to post Share on other sites
DIDO.1 22,844 Posted January 9, 2024 Author Report Share Posted January 9, 2024 On 09/01/2024 at 19:51, Daniel cain said: Half a day each container,if your on your own I'd say...cut out the old rotten floor..60/70mm of concrete,and set your first breeze block in the corner nice and level,strung a line up,then repeat every 800/900...cut timber bearers, noggins every 600,then board with marine ply and some sort of preservative diesel/oil mix creosote etc Expand That's for a super builder like yourself Have a ride up this summer in the camper.....we can have an evening on the Ribble 2 Quote Link to post Share on other sites
NEWKID 27,182 Posted January 9, 2024 Report Share Posted January 9, 2024 On 09/01/2024 at 19:06, mC HULL said: more 40 quid here i did me she’d out them in grey 3.6x2.5 meter a lot cheaper then the plastic cladding lol Expand Is that 3.6m long x 2.5m wide? 1 Quote Link to post Share on other sites
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.