Jump to content

Veiw from your office


Recommended Posts

13 minutes ago, scotty12 said:

Majority of my work is contracts for new builds kid 

IMG_3765.jpeg

Funnily enough I was having the crack with my brother this evening and he told me to do that on new build sites, piece of cake fencing tbh.

  • Haha 1
Link to post
Share on other sites

  • Replies 6.1k
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Popular Posts

Leaving home for the office View from the office. Closer view from the office.....they are farmed deer.... The office. Planting new trees and re-establishing old lines

Beautiful day this morning. Cheers Arry

Posted Images

13 minutes ago, scotty12 said:

Majority of my work is contracts for new builds kid 

IMG_3765.jpeg

That’s a good gig that, a lad I know does it, him and two mates are flinging them up, all the fences are the same and they just price by the meter 

  • Like 1
Link to post
Share on other sites
29 minutes ago, Stavross said:

That’s a good gig that, a lad I know does it, him and two mates are flinging them up, all the fences are the same and they just price by the meter 

Has its pros and cons mate moneys decent but not as good as private works but your guaranteed a lot of metres without chasing and pricing work up and down the country constant . Diggings a hit or a miss on sites where as private work 90% of the digging is good going. 

Link to post
Share on other sites
36 minutes ago, Goly said:

Funnily enough I was having the crack with my brother this evening and he told me to do that on new build sites, piece of cake fencing tbh.

Aye that's what they all say Kit Kat 

Link to post
Share on other sites
11 hours ago, scotty12 said:

 . Diggings a hit or a miss on sites where as private work 90% of the digging is good going. 

Do you hand dig or have a wee digger? Are the posts concreted in?

  • Like 1
Link to post
Share on other sites
7 minutes ago, scotty12 said:

Hand dug mate 2ft in the ground and 2 bags of postcrete per hole 

Quicker with ride on auger, come on pal you're just playing at it. Lol

Link to post
Share on other sites
Just now, Goly said:

Quicker with ride on auger, come on pal you're just playing at it. Lol

Aye pal what happens when the auger hits all those bricks and stones and you ain't getting a ride on auger or the likes across any that soil when it's wet. 
 

Remember doon  theirs for dancing up here's for thinking 🤨 

  • Like 1
  • Haha 1
Link to post
Share on other sites
5 minutes ago, scotty12 said:

Aye pal what happens when the auger hits all those bricks and stones and you ain't getting a ride on auger or the likes across any that soil when it's wet. 
 

Remember doon  theirs for dancing up here's for thinking 🤨 

I must remind all the lads that use them to scrap em. Lol

How often you hitting brick on a new build site like? 

Edited by Goly
Link to post
Share on other sites

Another day off and I seem to be getting worse as I get older another ceiling knocked out but as soon as the weather picks up I’m off in the mo ho Friday to Monday so nice to make the dollar when the weather is shite 

IMG_0481.jpeg

  • Like 5
Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
  • Recently Browsing   0 members

    No registered users viewing this page.


×
×
  • Create New...