Jump to content

Veiw from your office


Recommended Posts


  • Replies 5.7k
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Popular Posts

Leaving home for the office View from the office. Closer view from the office.....they are farmed deer.... The office. Planting new trees and re-establishing old lines

Beautiful day this morning. Cheers Arry

Posted Images

Busy old week last week, services in, finish off prep for sub floors, prep for base for a summer house ( some summer house, it works out at 10 cube ) after the prep for the sub floors it turns out the people that were meant to be pumping them in can’t get access to the site, so it looks like we will be doing them, at 18 cube mixed on site that won’t be getting done on a day rate

off to install lampposts at a school this week so that will give me time to decide how much I want to do the concrete 

4FB05362-51FC-4722-B46E-ED76190D44B0.jpeg

DD41679C-C1FB-47FC-A42C-9786A76BFBAC.jpeg

14FD5C95-EDB2-4734-B72A-37835FD3D197.jpeg

1A2208D2-D031-400C-9F40-2695F1DB919D.jpeg

  • Like 4
  • Thanks 1
Link to post
Share on other sites

Another busy week, lamppost installation at a school, 5 in total, we put all the cabling and ducting in and reinstate everything ready for the sparks just to connect, quoted 4 days, got it done in 3 so went and done a car charging point for them today, love working for these lads, just think of a number and double it, they don’t bat an eyelid, the just pay

B67CE022-0955-4AB9-8AF4-A04707B33F95.jpeg

48C0A8D2-52DC-4B61-88E2-A3E3D40A2E95.jpeg

6B1AD020-8DF6-4252-9C81-EBFAB78EC1EE.jpeg

  • Like 4
Link to post
Share on other sites
On 19/02/2023 at 09:48, Stavross said:

Busy old week last week, services in, finish off prep for sub floors, prep for base for a summer house ( some summer house, it works out at 10 cube ) after the prep for the sub floors it turns out the people that were meant to be pumping them in can’t get access to the site, so it looks like we will be doing them, at 18 cube mixed on site that won’t be getting done on a day rate

off to install lampposts at a school this week so that will give me time to decide how much I want to do the concrete 

4FB05362-51FC-4722-B46E-ED76190D44B0.jpeg

DD41679C-C1FB-47FC-A42C-9786A76BFBAC.jpeg

14FD5C95-EDB2-4734-B72A-37835FD3D197.jpeg

1A2208D2-D031-400C-9F40-2695F1DB919D.jpeg

Would love to have the practical skills to do something like that,looks really nice.

  • Like 1
Link to post
Share on other sites
8 minutes ago, mackem said:

Would love to have the practical skills to do something like that,looks really nice.

Most of what I do is just common sense ( and YouTube videos) but I work with a builder on things like this and he is unbelievable, he did all the oak and rebuilt the sandstone gable ends, a real skill 

  • Like 1
Link to post
Share on other sites
1 hour ago, Stavross said:

Another busy week, lamppost installation at a school, 5 in total, we put all the cabling and ducting in and reinstate everything ready for the sparks just to connect, quoted 4 days, got it done in 3 so went and done a car charging point for them today, love working for these lads, just think of a number and double it, they don’t bat an eyelid, the just pay

B67CE022-0955-4AB9-8AF4-A04707B33F95.jpeg

48C0A8D2-52DC-4B61-88E2-A3E3D40A2E95.jpeg

6B1AD020-8DF6-4252-9C81-EBFAB78EC1EE.jpeg

I was a self employed main contractor ground work for a lot of my working life mate. 

That a tidy job you can tell you take pride in doing a good job.

Cheers Arry

 

  • Like 3
  • Thanks 1
Link to post
Share on other sites
28 minutes ago, Arry said:

I was a self employed main contractor ground work for a lot of my working life mate. 

That a tidy job you can tell you take pride in doing a good job.

Cheers Arry

 

I do enjoy this kind of work, after spending 25 years working on trucks and chemical tankers and not really giving a sh*t it’s now nice to be working for myself and with mates and wanting to do a good job, I was offered another lamppost job yesterday where someone had concreted them in and wondered why they are all leaning now, so I’ll have a look at that 

P.S. them holes were filled with concrete, not just left like that ?

  • Like 2
Link to post
Share on other sites
5 minutes ago, Stavross said:

I do enjoy this kind of work, after spending 25 years working on trucks and chemical tankers and not really giving a sh*t it’s now nice to be working for myself and with mates and wanting to do a good job, I was offered another lamppost job yesterday where someone had concreted them in and wondered why they are all leaning now, so I’ll have a look at that 

P.S. them holes were filled with concrete, not just left like that ?

You will aways have work if a good job and tidy. People only want to pay to have the job done once. Word gets around if you take pride in your work.

Cheers Arry

  • Like 4
Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
  • Recently Browsing   0 members

    No registered users viewing this page.


×
×
  • Create New...