devon flighter 421 Posted August 17, 2014 Author Report Share Posted August 17, 2014 cheers butler ,your spot on about the shrinkage !the boarding at the back has been up for about 8 months ish now and yup shrunk about 1/8" between it wouldnt be major job to cover over with something !better forwarned 1 Quote Link to post Share on other sites
Butler 396 Posted August 17, 2014 Report Share Posted August 17, 2014 They will find away if possible to be together its the nature of them..... Also make sure any partition is a good 18" below ground they can dig like badgers......... 1 Quote Link to post Share on other sites
devon flighter 421 Posted August 17, 2014 Author Report Share Posted August 17, 2014 theres loads of hard core" well not exactly hard core but large lumps of broken concrete block wall about 18" deep under the pens blinded with smaller rubble to dust, to fill the gaps and then covered in about 6-8" of soil with sandstone at the partitions buried down to the hard core if that makes sense ? Quote Link to post Share on other sites
Chicken_man 1,651 Posted August 17, 2014 Report Share Posted August 17, 2014 Fort Knox :-P Quote Link to post Share on other sites
devon flighter 421 Posted August 18, 2014 Author Report Share Posted August 18, 2014 and some CM theres a ring of concrete around the external sides and back to hopefully slow "roland" down if he wants a visit too Quote Link to post Share on other sites
Chicken_man 1,651 Posted August 18, 2014 Report Share Posted August 18, 2014 Roland always wants to visit. But we can make his life very difficult :-) Quote Link to post Share on other sites
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.