Builders - More Questions About New Kennel Block!


Recommended Posts

4" blocks will be porous, but still use them. What I would do is belt and braces but you could do some of this yourself.

Get the brickie to build it as you want it, ask him to joint it internaly and flush it up externaly.

Then when he has finished get some SBR, mix it in a bucket with cement and a few handfulls of sand and make up a thick emulsion slurry, paint it one way and then the other, then apply two coats of render. Both with the waterproof additive, then when fully dry paint with the piolite masonry paint, Leyland, or other trade paint.Internally paint it with a water based masonry paint, then any moisture in the block can evaporate through.

Allow one to one and half days for the brick layer and two half days for the plasterer.

you should be paying around £100 a day maybe a little bit more for a good one.

Link to post
Share on other sites

  • Replies 97
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Popular Posts

4" block work pointed right then painted will be fine no need to render. And there are loads of single skin garage's.

It might take more than a day, as there is a limit to how high they can build in one day, as the weight of the bricks pushes out the wet cement at the bottom. Again get a builder to give you a price.

OK

GOOD SHOUT LOAF but the slurry tend to crack if you dont used silaca sand and you dont really need it sbr on its own will do as as a bonding bridge , then make sure you add it to the water and not direct to the mix as many do , allso let the render fully cure before over coating if your coating make sure its a water permiable product , the older systems arnt , go on the internet ORION PAINTS sell some good product that will tick all the boxes, ive used a siloxane but that was left over from a job

Link to post
Share on other sites
Guest cookiemonsterandmerlin

I would build the blocks on two cousres of engneering bricks to stop the ingress of water up though the blocks from dogs piss and rain water

 

ATB Cookie

its a kennel not a istambard kingdom brunel tunnell :laugh:

 

His stuff still standing for a reason well built and with the correct materials .

 

No dom littlewood chasing him around :thumbs:

Link to post
Share on other sites
Guest cookiemonsterandmerlin

worked on the summit tunnel bud after the oil tanker train fire eng brick had melted together with the heat the engeneering that went into it dwafs the shite they throw together now but that was mr stevensons work

 

G2E how many bricks have you laid in your life

 

ATB Cookie

Link to post
Share on other sites

why dont you ask the brickie who,s going to build it what to use,ps if he is worth his salt he will manage 2m high in one day no probs,atb wf

if he is "worth his salt" somehow i don't think he will :thumbs: but as for banging blocks down that shouldn't be to hard a task :thumbs:

  • Like 2
Link to post
Share on other sites

worked on the summit tunnel bud after the oil tanker train fire eng brick had melted together with the heat the engeneering that went into it dwafs the shite they throw together now but that was mr stevensons work

 

G2E how many bricks have you laid in your life

 

ATB Cookie

why cookie
Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
  • Recently Browsing   0 members

    No registered users viewing this page.


×
×
  • Create New...