grovsey 74 Posted October 13, 2011 Report Share Posted October 13, 2011 no rush at the moment mate Quote Link to post
shello 6 Posted October 14, 2011 Author Report Share Posted October 14, 2011 door fitted, felt on roof tomorrow then job's done for now (hopefully ) Quote Link to post
saxonmaster 74 Posted October 14, 2011 Report Share Posted October 14, 2011 good job mate Quote Link to post
shello 6 Posted October 14, 2011 Author Report Share Posted October 14, 2011 (edited) cheers mate, need to crack on with't roof felt now Edited October 14, 2011 by shello Quote Link to post
saxonmaster 74 Posted October 14, 2011 Report Share Posted October 14, 2011 no rush mate just watch the weather. As you couldnt put much of a slope on the roof mate i would put some cold Bitumen on before the felt mate. i made that mistake myself mate when i built my first ferret court a couple of years back when we had some heavy rain Quote Link to post
shello 6 Posted October 15, 2011 Author Report Share Posted October 15, 2011 might just look at doing that mate,either that or maybe some heavy duty exterior (waterproof) paint or varnish, that should do it! gonna let it dry out first tomorrow (weather permitting), shame about the slope but limited for space/angles at the back etc, still should be ok when i get the guttering/pipes fitted etc Quote Link to post
shello 6 Posted October 15, 2011 Author Report Share Posted October 15, 2011 there we have it, all done for now Quote Link to post
punch&judy 2 Posted October 15, 2011 Report Share Posted October 15, 2011 very nice. iv been out all day dividing a pen for the sparrow hawks and the ak:s bloody hard work , started at 7 just sort of finished now, least the rain held off Quote Link to post
shello 6 Posted October 15, 2011 Author Report Share Posted October 15, 2011 i can imagine you're well and truley knackered mate, i know i am ha ha, was gonna finish the travel box but decided to leave it for another day Quote Link to post
Millet 4,497 Posted October 15, 2011 Report Share Posted October 15, 2011 The finnished product is well tidy.. ..but dont forget to rig a double door system up if you plan on free lofting the bird.. Quote Link to post
shello 6 Posted October 15, 2011 Author Report Share Posted October 15, 2011 yes mate i have a plan for that, gonna rig a slimline door with plastic strips which opens inwards when i open't main door outwards Quote Link to post
saxonmaster 74 Posted October 15, 2011 Report Share Posted October 15, 2011 Quality mate she should be happy in there mate not long now and your be all stressed out like the rest of us with new birds hahaha Quote Link to post
shello 6 Posted October 15, 2011 Author Report Share Posted October 15, 2011 ha ha ha yea, let the fun begin Quote Link to post
jasper65 6 Posted October 15, 2011 Report Share Posted October 15, 2011 Been waiting to see the finish product and must say mate its a grand job <Bang Tidy> ........ when can I move in ..... Quote Link to post
shello 6 Posted October 15, 2011 Author Report Share Posted October 15, 2011 thanks mate, be cold in winter ha ha have to thanks a few folks for't help/advice and saxonmaster for a few tips, cheers Quote Link to post
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.