Jump to content

Purse Nets


Recommended Posts

I see quite a few guys on this site knit their own nets. How long does it take to complete each net with 2" mesh 14 wide and 18 long? I realise some will be quicker than others but was wondering the average time to knit a net. Thanks

Link to post

30 mins but you add mesh on and take it off as you wind back into your ring or toggle , rabbit netting or making nets i easy we learned as 14 year old juveniles ,gill nets long nets etc easy , dificult id lobster traps trawl nets etc thats a skill rabit nets first year apprentice stuff saw guys that can barely [bANNED TEXT] make nets so not to hard lol

Link to post

a net takes me 90-100 minutes each shaped starting at 8 out to 18 and back to 8 23rows long 4'6",21/4"meshboard and 1- 8"needle from start to finish no joining twine :thumbs:

Y.I.S Leeview

 

 

So am I right to think that on rows 11, 12 and 13 you are knitting to 18 wide. If not can you perhaps give me a breakdown on how this 23 row net works out. Appreciate your time. Thanks.

Link to post

a net takes me 90-100 minutes each shaped starting at 8 out to 18 and back to 8 23rows long 4'6",21/4"meshboard and 1- 8"needle from start to finish no joining twine :thumbs:

Y.I.S Leeview

 

 

So am I right to think that on rows 11, 12 and 13 you are knitting to 18 wide. If not can you perhaps give me a breakdown on how this 23 row net works out. Appreciate your time. Thanks.

Basically as you describe :thumbs: start with 8 and increase each end of every other row

so by 10 I have 18 on the meshboard 3 rows at 18 and then start decreasing every other row back down to 8 :thumbs:

Y.I.s Leeview

Link to post

a net takes me 90-100 minutes each shaped starting at 8 out to 18 and back to 8 23rows long 4'6",21/4"meshboard and 1- 8"needle from start to finish no joining twine :thumbs:

Y.I.S Leeview

 

 

So am I right to think that on rows 11, 12 and 13 you are knitting to 18 wide. If not can you perhaps give me a breakdown on how this 23 row net works out. Appreciate your time. Thanks.

Basically as you describe :thumbs: start with 8 and increase each end of every other row

so by 10 I have 18 on the meshboard 3 rows at 18 and then start decreasing every other row back down to 8 :thumbs:

Y.I.s Leeview

 

Cheers mate - really helpful. Appreciate your time.

Link to post

wow you guys are fast! It takes me about 1 hrs 10 mins for 15 wide 4' long double knot.Try and do one a night when the soaps come on!

ATB Seany :thumbs:

keep at it mate i used to take me a long time but the more you do the faster you get :thumbs: i make 5 to 6 every day/night i double knot all mine to atb alan

 

 

:thumbs:

Link to post

a net takes me 90-100 minutes each shaped starting at 8 out to 18 and back to 8 23rows long 4'6",21/4"meshboard and 1- 8"needle from start to finish no joining twine :thumbs:

Y.I.S Leeview

 

 

So am I right to think that on rows 11, 12 and 13 you are knitting to 18 wide. If not can you perhaps give me a breakdown on how this 23 row net works out. Appreciate your time. Thanks.

Basically as you describe :thumbs: start with 8 and increase each end of every other row

so by 10 I have 18 on the meshboard 3 rows at 18 and then start decreasing every other row back down to 8 :thumbs:

Y.I.s Leeview

 

Cheers mate did this and it worked great. Appreciate your help and time. :thumbs:

Link to post

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
  • Recently Browsing   0 members

    No registered users viewing this page.

×
×
  • Create New...