How To Build a Larsen Trap

17
24438
Larsen Trap
Larsen Trap

How To Build a Larsen Trap

Larsen Trap
Larsen Trap

1. Firstly you will need to aquire some timber either ready cut or if you are able to cut it yourself all the better.

2. Next you need to cut your timber to size, the main frame is made from 1″ * 1,3/4″  So if you have a table saw then you can rip this to size from larger size timber.

3. Next you need to cut your timber into the lengths you need.
For the frame you need:

For one larsen trap:

4* lengths at 30″
8* lenghts at 28″
9* lenghts at 18″

Larsen Trap Building Stage 1
Larsen Trap Building Stage 1

4. Take 4 lengths at 28″ and then half lap them in the middle so they fit toghether as a cross. All will become apparent.

5. Once this is done then you can begin to fit the pieces toghether.

Joining the half lapped peices toghther and then take two 30″ lengths and two 28″ lengths and make a square frame that measures 30″*30″

Larsen Trap Building Stage 2
Larsen Trap Building Stage 2

6. Next step is to assemble the crosses into the frames, make sure to center and square them up before nailing toghether.

Larsen Trap Building Stage 3
Larsen Trap Building Stage 3

You should now be left with ( if you are making one larsen, i am making three) two frames and nine lengths at 18″.

The next step is to fit the two frames together with the pieces of 18″ lengths.

Larsen Trap Building Stage 4
Larsen Trap Building Stage 4

The corners and middle ones don’t realy matter which way round they go, but i like to keep mine uniform so that the overall look of the trap is good. I drill a pilot hole through the frame and then use a three inch screw to fasten the post onto the frame.

The middle post is crucial to its positioning, it determines wich two halves of the trap will be.

Larsen Trap Building Stage 5
Larsen Trap Building Stage 5
Larsen Trap Building Stage 6
Larsen Trap Building Stage 6

Once you have your posts fitted to one frame then you can do the exact same and fit the other frame.

Larsen Trap Building Stage 7
Larsen Trap Building Stage 7

Once you get to this stage it is wise to fire a pin into each joint whilst squaring the whole thing up, this will also help to stop the posts from twisting and also keep the frame square.

Next job to do is to drill holes for the pivot bar for the trap doors. I position this hole 3, 3/4″ from the edge of the frame and center in the length of timber. There are 4 holes to drill and these holes are the same size as the bar, which is 1/4″ or 6mm.

Larsen Trap Building Stage 8
Larsen Trap Building Stage 8
Larsen Trap Building Stage 9
Larsen Trap Building Stage 9

Its easier to do this now before the wood is treated so that you can see your pencil marks.

I am using 6mm threaded bar as this tends to hold in the frame without having to fasten it on.

Larsen Trap Building Stage 10
Larsen Trap Building Stage 10

Next i tend to treat the frame with whatever preservative that i have got spare. Best to use a dark colour so that the trap doesn’t stick out like a sore thumb.

Larsen Trap Building Stage 11
Larsen Trap Building Stage 11

Whilst your frame is soaking up the treament, you have time now to get on with the service lid and other things.
You will need to aquire some 1/4″ plywood and cut this into 1 length of 15″ * 15″  1 length of 15″ * 17″  1 length 7″ * 7″ and 1 length 15″ * 3″

Take the piece 15 * 15 and cut a hole 6″ square 2″ from the edge and center. (you will see in the photo)
A tip is mark the square on the board and then drill out the corners first with a large forstner bit, 30mm should do, then cut inbetween the holes to finish off the square. This has the advantage of leaving nice rounded corners.
Using sand paper get rid of any rough edges that you might ladder your tights on.

In the 7 * 7 peice drill a finger hole, again 30mm should do.

Larsen Trap Building Stage 12
Larsen Trap Building Stage 12

Next you need to take 2 lengths of frame timber  1″ * 1,3/4″ and cut them to 13″ long.

Next is a bit tricky if you don’t have a table saw, but can be done with a hammer and chisel if nessacary.  You need to rabbit out the edges of the timber just over the depth of the plywood and about 1/2″ wide. This is to allow the door to slide once in place.

Larsen Trap Building Stage 13
Larsen Trap Building Stage 13

The next step is too assemble these pieces together.

So take your 15*15 piece of ply with the hole cut in it, and your sliding lid 7*7 and also the two peices of rabbited wood.

You need to fix the peices of rabbited wood to the plywood board as shown in this photo,
the sliders are postioned 2″ from the edge (you will see when building how this all fits together).

Larsen Trap Building Stage 14
Larsen Trap Building Stage 14

Next job is to fit the piece of ply 15*17 into place as shown in this photo.

Larsen Trap Building Stage 15
Larsen Trap Building Stage 15

Next you need to place your wire (you can either use wire netting with a 1″ mesh or if you can afford it weldmesh with 1″ mesh,  I havent caught enough moles to be able to afford weldmesh so i am using wire netting) inbetween the two sections of trap, also now is the time to fit the perches.

You dont need fixed perches, you can use hazel branches poked through the wire netting, but it does make a mess of the wire netting eventualy.

Note i do not treat the perches with anything (your call bird does not need to be sitting on perches that have been treated with anything that could cause thier feet to react badly.)

Larsen Trap Building Stage 16
Larsen Trap Building Stage 16

Next place your wire over one half of the call bird compartment and then fit the service lid (do not forget to place the sliding door into the runners before you screw the lid down).

Larsen Trap Building Stage 17
Larsen Trap Building Stage 17

Now you can go ahead and wire netting up the sides and bottom.

Larsen Trap Building Stage 18
Larsen Trap Building Stage 18

Next you need to make the trap doors. I make these from slightly thinner wood 1,3/4″ * 3/4″, this is to make the doors a bit lighter in weight. They measure 12 1/2″ * 11 1/2″ overall.

Once you have nailed these toghether you need to then drill holes for the threaded bar to pass through, but these holes will be slightly bigger in diameter than the bar. The holes are placed 2″ from the edge.

Larsen Trap Building Stage 19
Larsen Trap Building Stage 19

Once you have drilled the holes, treat the wood and fit your wire. Next you need to fit a spring to each door, best way is poke the threaded bar through the hole in the door and then place the spring over the bar and fasten the spring to the door with staples (wire staples).

Next you need to fit the doors in place hammer the bar through the frame and locate the door onto the bar and pass the bar through each hole in turn.

Once the door is fitted, you need to staple the other part of the spring onto the frame.

Larsen Trap Building Stage 20
Larsen Trap Building Stage 20

Once this is done with both doors, you can then place your piece of plywood 15*3 onto the frame to stop the doors from springing right open.

Larsen Trap Building Stage 21
Larsen Trap Building Stage 21

Next get hold of some flexible wire and wire the sliding door to the cage in some fashion, so that it cannot slide open, only you can undo the wire for operation, not the call bird.

Also i use a washed out dog food tin with a couple of holes knocked through it and wired onto the inside of the call bird section for a drinking solution for the call bird.

Larsen Trap Building Stage 22
Larsen Trap Building Stage 22

To set the trap get some dowel cut to length and then in half as shown in the picture.

Larsen Trap Building Stage 23
Larsen Trap Building Stage 23

You now have your working larsen trap.

But remember RULES apply when trapping, make sure that your call bird has a fresh supply of water each day and also fresh clean food everyday.

REMEMBER TO CHECK YOUR TRAPS EVERYDAY!!!!!!!!!!!!!!!!!

Good trapping all.